An Activity Diagram is also called as an Arrow Diagram, because it has arrows in it. It is also known as PERT(Program Evaluation Review Technique). This diagram is mainly intended to identify the time sequences of events which are pivotal for the project. This helps for comprehending the event sequences driving them towards the achievement of objectives prioritizing the time requirements. This diagram is useful when a project has multiple activities to be handled effectively.

This started out as an engineering and construction project management tool. It helps in finding out the most efficienrt sequence of events needed to complete the project. It facilitates us to create a very realistic project schedule by graphically showing

The total amount of time needed to complete the project

The sequence in which tasks must be carried out

Which tasks can be carried out at the same time

Which are the critical tasks that you need to keep an eye on

Procedure for development

Identify all activities and relationships among them.

Sketch the diagram.

Estimate the times for each activity, or node, in the diagram .

Determine the critical path.

Evaluate the diagram for milestones and target dates in the overall project.

Drawing Rule

All the preceding activities must be completed before the project can begin.

The arrows represent the logical precedence of the project.

When to Use It

Use it when planning any project or activity which is composed of a set of interdependent actions.

Use it to calculate the earliest date the project can be completed, and to find ways of changing this.

Use it to identify and address risk to completing a project on time.

It can also be used for describing and understanding the activities within a standard work process.

The resulting diagram is useful for communicating the plan and risks to other people.


History

It was developed by the U.S. Department of Defense. It was first used as a management tool for military projects. It was Adapted as an educational tool for business managers.


Example of Activity Network Diagram

A project is composed of a set of actions or tasks which usually have some kind of interdependency. For example, before an axle can be turned, it must first be designed, the metal must be purchased, etc. This type of complex system is much easier to understand through the use of diagrams than through textual description, as actual interconnections between tasks can be shown. You can draw the activity network diagram easily with Edraw software.



The Activity Network diagram displays interdependencies between tasks through the use of boxes and arrows. Arrows pointing into a task box come from its predecessor tasks, which must be completed before the task can start. Arrows pointing out of a task box go to its successor tasks, which cannot start until at least this task is complete.

A project team in a chain store, working on a problem with the customer response process, came up with a solution that required careful implementation. They decided to use an Activity Network to plan and manage this stage, with the key objective of implementing the solution with no degradation of service to customers at any time.

They used cards with a Tree Diagram to identify the tasks that would need to be done, then transferred the bottom-level tasks, one at a time, to the Activity Network and completed this with effort estimations and dependency links between tasks. They then entered it into a computer system to calculate timings, perform resource smoothing and help reduce slack time.

The plan showed that the time and effort in implementation would fall outside their budgeted figure. They consequently took the plan to the steering committee to get authority to spend additional time on the project. The implementation went very smoothly.


Friday, April 3, 2009

Rich Picture


Rich Picture

A rich picture is a way of representing the things what we know about a situation.- the issues, actors, problems, processes, relationships, conflicts and motivations – which creates a valid reason about these aspects. It is a graphical tool addressing the state of ambiguity at the beginning of any exploration or research about an issue. It is the first step in the process of assessment of a situation. It gives a clear idea about the entire scenario like what is the exact problem , what are the various factors related to it. By seeing at this we come to know the complete picture of the problem. This makes us to know that we are dealing with a problematic situation, and takes us to a state where we have identified one or more themes we want to deal with. Peter Checkland is the person who introduced the concept of rich pictures to the world. He is a British management scientist. He designed this for use in the early stages of his Soft Systems Methodology (SSM), an approach that recognizes that problems do not exist separate from the people involved in them and appreciates the multiple viewpoints of those participants. Essentially, SSM attempts to understand human systems in a way that is meaningful to actors in that system. SSM says that humans are the part of any problem or project that arises, they are no more separated. Rich pictures are tools to learn not only about the observable particulars of a situation, but also about the abstract or emotional things like the social atmosphere among the actors. This is called as a Rich Picture because it is very much rich with the information.

Soft Systems Methodology(SSM) is an methodology used for organizational process modeling. This is used for both general problem solving and also in the management of change. This works on the concept of system thinking. System Thinking is a concept that explains that the component part of the system will act differently when it is isolated from its environment.
.

Constructing rich pictures can reveal all sorts of questions and observations about the problem situation. The value of rich pictures becomes particularly clear when we share it with others, identifying different perceptions of and assumptions about what is going on. That is when we can see connections, dead-ends, possibilities and contradictions that we may have otherwise missed. It can be difficult to face other people’s often surprisingly different assumptions, because this exposes us to the demanding task of questioning our own. It can mean throwing away the solutions we thought we had, going back to the beginning and starting anew. Of course, that is often exactly what is needed at the start of a systemic inquiry.

The aim of this rich picture is to make a pictorial representation of the elements that need to be considered when inquiring a problem, like the stakeholders and issues, the interactions and connections and links between them. This picture can identify the points that are to be monitored, the pin points, the change agents, the change effects , etc.,

Rich Pictures are helpful in identifying the open loops in the system and also the redundant ways of checking at the early stage. Major issues will show up relatively easily. It can be a useful tool to compare the differences before and after process review.

Rich pictures are drawn at the pre-analysis stage, before you know clearly which parts of the situation should best be regarded as process and which as structure.









Part of a rich picture of a telephone helpline situation

Rich pictures or situation summaries are used to depict complicated situations. They provide us with a summary of the situation that you are going to handle. They are an attempt to encapsulate the real situation through a no- holds-barred, cartoon representation of all the ideas covered already layout, connections, relationships, influences, cause-and-effect, and so on. As well as these objective ideas, rich pictures portray subjective elements such as the character and characteristics, points of view and discrimination, spirit and human nature. If you are working with a client you should try to draw these from the actors themselves, at least initially, rather than focusing on your own interpretation of the situation.

Elements of the Rich Picture:

  • pictorial symbols;
  • keywords;
  • cartoons;
  • sketches;
  • symbols;
  • title;

Constructing A Rich Picture











A rich picture of a rich picture from The Open University’s Faculty of Technology

Begin with large sheets of paper and lots of coloured pens, and then simply draw what you see happening. Draw all that you perceive as problematic or significant - emotions and relationships as well as groupings and connections of various sorts - using symbols and metaphors to represent the situation in a way that is explicit and understandable by others. A rich picture can cope with whatever chaotic mess of thoughts and perceptions flows onto the page. Rich pictures do not have a formal syntax, and different people take different approaches, but these general guidelines have emerged as being useful:

  • Structure. Structure is the part of the situation which is stable and very slow in changing. It includes things like organisational structure, geographic location, physical layout and all the people who are affected by the situation.
  • Process. Process is the transformation that takes place within the structure. This represents the change in the system. These transformations might be part of a flow of goods, documents, or data.
  • Concerns (Checkland calls these “issues”). Concerns represents the intention of an actor to participate in the situation. This depicts the perception of the actors.

  • Yourself. You should include yourself in the situation and clearly mention the roles and responsibilities.

A useful way to start a high level analysis is to identify players in the process. A quick and simple method is to use Rich Pictures - example below shows the players and the key interactions between them for the following simple tea-making scenario:

  1. Hostess asks who would like a cup of tea
  2. Visitors signify whether they want a cup
  3. Host is sent to put kettle on
  4. Hostess gathers information on preferences for sugar and milk
  5. Hostess gets sugar and milk ready
  6. Host brews and pours tea
  7. Hostess puts mugs on tray
  8. Host carries tray back to visitors and hands out mugs















Sources: John Naughton, Soft Systems Analysis: An Introductory Guide, The Open University Press, 1984; Andrew Monk and Steve Howard, The Rich Picture: A Tool for Reasoning About Work Context, 1998.